The first work day of 2008 went like every other day in 2007. Same projects, same follow up, and some new work tossed in the mix. My horoscope today said that I would have energy from my high work interaction. I'm not sure about that but I interacted with work more than normal on some things and did my best to ignore others. I was the document revision queen until I realized the formatting fell apart with the changes so I gave up. My laptop has only decided to freeze up and go to the blue screen of death once today (during this post) so it's been business as usual. At least this is a short work week!
Cruising the Danube
Life on the river often means spots where I can't get a good wifi connection so I'm a bit behind on blogging. I'm going to do this one fast and then get more detailed on the last two stops. I'm sailing with AMA Waterways and the ship is the AmaVerde as seen from the dock in Vidin. Usually I share a bigger cabin with a friend but for this trip we decided to splurge and get our own cabin. Here's my little home for the week. Most of Thursday was on the ship as we sailed from Bulgaria to Serbia. This lock is the second gate of the Iron Gates. Looking over at the dam on the river. View from my cabin. The water is just below the window. There are only three decks on this ship and I'm on Level 3.
Comments
Post a Comment